Sign In | Join Free | My himfr.com
Home > Advanced Metering Infrastructure >

Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication

    Buy cheap Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication from wholesalers
     
    Buy cheap Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication from wholesalers
    • Buy cheap Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication from wholesalers

    Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication

    Ask Lasest Price
    Brand Name : Radarking
    Model Number : RDK-CJQ
    Certification : ISO9001, ISO4001
    Price : Negotiate
    Payment Terms : Western Union, L/C, T/T
    Delivery Time : 35 days
    • Product Details
    • Company Profile

    Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication

    Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication

    1. Product Description

    Data Collector with RS485 interface for Smart Electricity Meter Power Grid System can support LV concentrator to complete the data communication channel switching for the smart energy meter of RS-485 communication method, guide rail mounted and compactable with hook mounted design, suitable for the applications where the meter box space is limited and requires only transparent data transmission.

    2.Specification:

    1Operating Frequency Band470MHz~510MHz / 223~ 230MHzOr Customized
    2ModulationGFSK / GMSKConfigurable
    3Air Transmission RateDefault 10Kbps, 1.2Kbps~100KbpsOr Customized
    4ERP< 17dBm / 20dBm~30dBm
    5RX Sensitivity-116dBm(BER=0.1%,10Kbps)
    6Signal Level Range3.3V / TTL Level / CMOS compatible
    7Air Baud RateDefault 10Kbps, 1.2Kbps~100KbpsOr Customized
    8Supply Voltage220V AC -20%~+20% 50Hz,1.9times Standard voltage, no damage within 4 hours
    9Working CurrentTransmit Current≤100mA;Quiescent Current≤50mA
    10Serial InterfaceData Bits 8;Even Parity Check, stop bit 1
    11Software MaintenanceWireless Smart Update
    12Bit Error RateLess than 1%
    13SizeMeet the China State Grid Regulation issued in May, 2013Or Customized
    14Technical RegulationMeet the China State Grid Regulation issued in May, 2013Or Customized


    3. Technical Parameters:


    1, Operating Power: AC220V±20%,50Hz(single Phase)

    2,Static Power Consumption: ≤5W

    3,Upward Communication Interface: Radio Frequency ≥300m (open field)

    4,Downward Communication Interface: RS-485 bus line. M-BUS bus line, Radio frequency.


    5,Operating Temperature: -25℃~+55℃

    6,Relative Humidity: 5%~95% (non-condensate)


    4. Installation Requirements:


    • Collector Installation Requirements:

    4.1.1 Wall mounted, has three fixed holes, can be fixed on the wall surface.

    4.1.2 Collector should be installed in the building, if outdoor installation, should configure the outdoor protective box, in avoid the direct sunlight and rain.

    4.1.3 Collector should be installed the at the position which the meter is relatively concentrated.

    4.1.4 The power supply of collector should be stable, in avoid the data can’t be collect caused by the power outage. The power line adopts the 2×0.5mm2 thickness or thicker wires, and install the earth-leakage protective device.


    • Antenna Installation Requirements:

    4.2.1 The antenna will be installed at the outdoor or outdoor relative open position, and antenna is towards the concentrator.

    4.2.2 The antenna will be within the scope of effective protection of lighting rod and will be more than 1.5 m below than lighting rod.

    4.2.3 Install the corresponding frequency antenna according to the antenna terminal instruction on the collector case. Must guarantee the upward and downward antenna communication frequency, channel, concentrator, smart meter correspond strictly when installation. The communication frequency of sucker antenna will be checked the label at the bottom of antenna.

    4.2.4 Antenna bracket fixed well, and the antenna base will be fixed firmly on the bracket. Tight the magnet part of antenna head, and also tight firmly the junction between the antenna and collector.

    4.2.5 In order to avoid the antenna was surrounded by the metal objects. The antenna position should be far away from the air conditioner compressor, transformer, communication cable,etc.





    Quality Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: WUHAN RADARKING ELECTRONICS CORP.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)